Health & Safety

Crete New RAMS

Create a new risk assessment document

View Previous RAMS

View Completed RAMS

Method Statement
Date Created
  06-02-2026
Site Reference/Job Number
  GNR250356
Created By
  Tom
Client Name
  Kate Loomes
Client Email
  kateloomes@gmail.com
Site Address
  South View, Flaxton
York YO60 7RN
Map It
Site Image
  IMG_78921.JPG
Internal Reference:
  4889
Start Date
  09/02/2026
End Date
  20/02/2026
Housekeeping
 
  • Allocate 10-15 minutes each day to clean down and tidy work areas and scaffold.
  • With 1 hour Friday afternoons for full site clean down including scaffold areas and ground level.
  • All debris to be either cleared to site skip or cleared from site to skips at company yard.
  • Site and work areas responsibility to all operatives on site to ensure kept clean and tidy.
  • If scaffold is over public areas, ensure scaffold netting in place and scaffold boards are covered.
  • Ensure all cigarette butts are disposed in safe and hygienic manner.
Imagery
 
  • Please take images for the works carried out as below:

    • Initial start on site
    • Friday afternoon, overview of works from corners of scaffold.
    • When areas opened up, and prior to new coverings.
    • Images if on iPhone can be uploaded in the office on a Monday morning via Airdrop or can be sent via other electronic means.
Send Copy To Yourself
 
  • Yes
Nearest Hospital
Nearest Hospital
  York Hospita
Site Setup
 
  • Welfare Facilities
  • Skips placed on site
  • Emergency Procedure
  • First Aid
  • Storage Compound
Welfare Facilities
 

Welfare arrangements are supplied by the client or principal contractor.
These should be in line with Schedule 2 of the Construction Design & Management Regulations 2015 (CDM).

All sites are to have a minimum amount of welfare facilities available for workers, which include the following:
• Toilets
• Washing facilities
• Drinking water
• Rest facilities

Emergency Procedures
 

The client or principal contractor will ensure that the existing site emergency procedures are followed and that relevant information is given to operatives at time of induction or when changes are made to procedures.

The principal contractor is responsible for ensuring that all operatives under their control adhere to the site emergency procedures at all times.

The closest hospital is: York Hospital

First Aid
 

Refer to on site safety notice boar / site file for all first aid information.

A first aid box with enough equipment to facilitate the number of operatives on site will be provided by the Principal Contractor.

Principal contractor will nominate and appointed person to take care of first aid arrangments.

Number of appointed first aiders shall be dependedt upon the number of employees on site.

Storage Compound
 

All COSHH relevant materials will be stored on site in accordacne with relavant regulations.

A secure site compound will be provided for the duration of the work.

PPE Requirements
 
  • Hi-Vis Vests
  • Safety Boots
  • Hard Hats
  • Face Fit Masks (FFP3)
  • Protective gloves (BS EN 388:2016+A1:2018)
  • Hearing Protection Ear Muffs to (BS EN 352-1)
  • Safety Goggles
Training & Legislation
 

All operatives are adequately trained to carry out required tasks.

All site operatives hold current certification and have the following training.

  • CSCS Certification
  • Working at heights training

Legislation

  • Health and Safety Work Act 1974
  • The Management of Health and Safety at Work Regulations 2006
  • The Control of Asbestos Regulations 2012
  • Provision and Use of Work Equipment Regulations (PUWER) 1998
  • Control of Substances Hazardous to Health Regulations 2002
  • The Work at Height Regulations 2005
  • The Personal Protective Equipment at Work Regulations 2002
  • The Manual Handling Operations Regulations 1992
  • The Construction (Design and Management) Regulations 2015
Description of activity
 

As outlined by our previous specification document. GNR-250346

Additional work areas
Operatives Assigned To Project
 
  • Grzegorz Bialczak
  • Nathan Bradley
  • Kazimierz Kowalczyk
  • Leon Rycroft
  • Louis Brundrett
  • Jonathan Clark
  • Thomas Mackley
  • Sub Contractor
  • Scaffolding Contractor
Tools & Equipment
Tools/Equipment
 
  • Battery Operated
  • 110 Volt Equipment
  • Hoisting Provision Manual
Battery Operated
 
  • Drill
  • Impact Driver
  • Grinder
  • Circular Saw
  • Paddle Mixer
  • Paslode Nail Gun
110 Volt
 
  • Circular Saw
  • Grinders / Disc Cutters
  • Transfomer 240v - 110v
  • Cables and leads
Materials
Materials
 
  • Timber/Wood
  • Slates
  • Rolled Lead sheet
  • Sealants and adhesives
Timber/Wood
 
  • 25mm x 50mm Battens
  • Exterior Grade Ply
Slates
 
  • Welsh Slates
Materials
 
  • Sand
  • Cement
  • Lime
Project Health & Safety Monitoring
Supervision of the work will be carried out by;
 
  • Jonathan Clark
Overall Health & Safety monitoring will be conducted by;
 
  • Oliver Neal
  • Thomas Mackley
Add Signature Sheet
 
  • Yes, Include Signature Sheet
Known Hazards
GNR Risk Assessments
 
  • GNR002 Delivery of Materials
  • GNR003 Manual Handling
  • GNR004 Working at Height
  • GNR005 Use of Ladders
  • GNR006 Mechanical Lifting
  • GNR008 Disc Cutters & Abrasive Wheels
  • GNR009 Lead Work
  • GNR010 Lead Welding
  • GNR012 Storage & Disposal of Waste Materials
  • GNR013 Hand Tools including Powered Drills & Hot Air Welding Guns
  • GNR020 Dust
  • GNR029 Tower Scaffolds
  • GNR041 Lead Sealant
  • GNR046 Paslode Gun
  • GNR047 Vibration
  • GNR048 Noise
  • GNR069 dermatitis
COSHH Register
COSHH Assessments
 
  • CA/018 Cement
  • CA/019 Lead
  • CA/020 Patination Oil
  • CA/028 1F Roofing Felt
Warnings
 
  • Flammable
  • Gas under pressure

← Go Back to Entries