Health & Safety

Crete New RAMS

Create a new risk assessment document

View Previous RAMS

View Completed RAMS

Method Statement
Date Created
  26-03-2026
Site Reference/Job Number
  GNR260052
Created By
  Tom
Client Name
  Anne Rozenbrovek
Client Email
  westellahall@gmail.com
Send RAM's To Client Email
 
  • Yes, Send To Client
Site Address
  West Ella Hall, West Ella
Hull HU10 7SD
Map It
Site Image
  IMG_63692.JPG
Internal Reference:
  West Ella Lodge
Start Date
  07/03/2026
End Date
  10/04/2026
Housekeeping
 
  • Allocate 10-15 minutes each day to clean down and tidy work areas and scaffold.
  • With 1 hour Friday afternoons for full site clean down including scaffold areas and ground level.
  • All debris to be either cleared to site skip or cleared from site to skips at company yard.
  • Site and work areas responsibility to all operatives on site to ensure kept clean and tidy.
  • If scaffold is over public areas, ensure scaffold netting in place and scaffold boards are covered.
  • Ensure all cigarette butts are disposed in safe and hygienic manner.
Imagery
 
  • Please take images for the works carried out as below:

    • Initial start on site
    • Friday afternoon, overview of works from corners of scaffold.
    • When areas opened up, and prior to new coverings.
    • Images if on iPhone can be uploaded in the office on a Monday morning via Airdrop or can be sent via other electronic means.
Send Copy To Yourself
 
  • Yes
Nearest Hospital
Nearest Hospital
  Hull Royal Infirmary
Site Setup
 
  • Welfare Facilities
  • Off site waste disposal
  • Emergency Procedure
  • First Aid
  • Storage Compound
Welfare Facilities
 

Welfare arrangements are supplied by the client or principal contractor.
These should be in line with Schedule 2 of the Construction Design & Management Regulations 2015 (CDM).

All sites are to have a minimum amount of welfare facilities available for workers, which include the following:
• Toilets
• Washing facilities
• Drinking water
• Changing rooms and lockers
• Heating
• Rest facilities

Emergency Procedures
 

The client or principal contractor will ensure that the existing site emergency procedures are followed and that relevant information is given to operatives at time of induction or when changes are made to procedures.

The principal contractor is responsible for ensuring that all operatives under their control adhere to the site emergency procedures at all times.

The closest hospital is:

Hull Royal Infirmary

Anlaby Road, Hull, HU3 2JZ

First Aid
 

Refer to on site safety notice boar / site file for all first aid information.

A first aid box with enough equipment to facilitate the number of operatives on site will be provided by the Principal Contractor.

Principal contractor will nominate and appointed person to take care of first aid arrangments.

Number of appointed first aiders shall be dependedt upon the number of employees on site.

Off Site Waste Disposal
 

Due to the nature of the property, limited parking, and access constraints we will place a skip at our premises for the disposal of waste as works progress.

Skips will be provided off-site for the duration of the work.

The collection of waste will be carried out on a regular basis using an appropriate vehicle.
Waste will be carried to our premises to be disposed of.

Waste streams will be separated for recycling where appropriate.

Storage Compound
 

All COSHH relevant materials will be stored on site in accordacne with relavant regulations.

A secure site compound will be provided for the duration of the work.

PPE Requirements
 
  • Hi-Vis Vests
  • Safety Boots
  • Hard Hats
  • Face Fit Masks (FFP3)
  • Protective gloves (BS EN 388:2016+A1:2018)
  • Hearing Protection Ear Muffs to (BS EN 352-1)
  • Safety Goggles
Training & Legislation
 

All operatives are adequately trained to carry out required tasks.

All site operatives hold current certification and have the following training.

  • CSCS Certification
  • Working at heights training

Legislation

  • Health and Safety Work Act 1974
  • The Management of Health and Safety at Work Regulations 2006
  • The Control of Asbestos Regulations 2012
  • Provision and Use of Work Equipment Regulations (PUWER) 1998
  • Control of Substances Hazardous to Health Regulations 2002
  • The Work at Height Regulations 2005
  • The Personal Protective Equipment at Work Regulations 2002
  • The Manual Handling Operations Regulations 1992
  • The Construction (Design and Management) Regulations 2015
Description of activity
 

As outlined by our previous specification document. GNR-260052

Additional work areas
Operatives Assigned To Project
 
  • Charlie Bedford
  • Jonathan Clark
  • Thomas Mackley
  • Carl Tumman
  • Scaffolding Contractor
Tools & Equipment
Tools/Equipment
 
  • Battery Operated
Battery Operated
 
  • Drill
  • Impact Driver
  • Grinder
  • Circular Saw
  • Multi Tool
  • SDS Drill
  • Add More
Equipment
 
  • Lead Welding Equipment
Materials
Materials
 
  • Timber/Wood
  • Rolled Lead sheet
Timber/Wood
 
  • 25mm x 50mm Battens
  • Exterior Grade Ply
Project Health & Safety Monitoring
Supervision of the work will be carried out by;
 
  • Jonathan Clark
Overall Health & Safety monitoring will be conducted by;
 
  • Oliver Neal
  • Thomas Mackley
Add Signature Sheet
 
  • Yes, Include Signature Sheet
Known Hazards
GNR Risk Assessments
 
  • GNR002 Delivery of Materials
  • GNR003 Manual Handling
  • GNR004 Working at Height
  • GNR005 Use of Ladders
  • GNR008 Disc Cutters & Abrasive Wheels
  • GNR009 Lead Work
  • GNR010 Lead Welding
  • GNR012 Storage & Disposal of Waste Materials
  • GNR020 Dust
  • GNR041 Lead Sealant
  • GNR047 Vibration
  • GNR048 Noise
COSHH Register
COSHH Assessments
 
  • CA/019 Lead
  • CA/020 Patination Oil
Warnings
 
  • Flammable
  • Gas under pressure

← Go Back to Entries